{"section":{"heading":"Related Images and Videos (9)","tiles":[{"href":"/en/st/0867143033","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143033/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143037","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143037/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143038","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143038/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143039","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143039/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143040","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143040/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143041","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143041/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143042","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143042/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143043","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143043/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0867143044","title":"A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025","thumbnailUrl":"/api/media/867143044/small?db=stock","credit":"IMAGO / Achille Abboud","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}