{"section":{"heading":"Ähnliche Bilder und Videos (3)","tiles":[{"href":"/de/st/0865978205","title":"RECORD DATE NOT STATED Bailey Bridge construction is underway to restore connectivity after the flood at Devighat Nuwakot Nepal , Sep 05 (ANI): Bailey Bridge construction is underway by the Nepali Army over the Tadi River at Devighat after it was damaged by flash floods, in Nuwakot on Saturday. (ANI Video Grab) Nuwakot Bagmati Nepal Copyright: xANIx ANI_20260905432","thumbnailUrl":"https://www.imago-images.de/bild/st/0865978205/s.jpg","credit":"IMAGO / ANI News","licences":[{"key":"1","name":"Standard","figure":"29 €"},{"key":"2","name":"Extended","figure":"99 €"}]},{"href":"/de/st/0865978213","title":"RECORD DATE NOT STATED Bailey Bridge construction is underway to restore connectivity after the flood at Devighat Nuwakot Nepal , Sep 05 (ANI): Bailey Bridge construction is underway by the Nepali Army over the Tadi River at Devighat after it was damaged by flash floods, in Nuwakot on Saturday. (ANI Video Grab) Nuwakot Bagmati Nepal Copyright: xANIx ANI_20260905435","thumbnailUrl":"https://www.imago-images.de/bild/st/0865978213/s.jpg","credit":"IMAGO / ANI News","licences":[{"key":"1","name":"Standard","figure":"29 €"},{"key":"2","name":"Extended","figure":"99 €"}]},{"href":"/de/st/0865978214","title":"RECORD DATE NOT STATED Bailey Bridge construction is underway to restore connectivity after the flood at Devighat Nuwakot Nepal , Sep 05 (ANI): Bailey Bridge construction is underway by the Nepali Army over the Tadi River at Devighat after it was damaged by flash floods, in Nuwakot on Saturday. (ANI Video Grab) Nuwakot Bagmati Nepal Copyright: xANIx ANI_20260905436","thumbnailUrl":"https://www.imago-images.de/bild/st/0865978214/s.jpg","credit":"IMAGO / ANI News","licences":[{"key":"1","name":"Standard","figure":"29 €"},{"key":"2","name":"Extended","figure":"99 €"}]}]}}