{"section":{"heading":"Related Images and Videos (1)","tiles":[{"href":"/en/st/0867949151","title":"Laeufer Feld at the bottleneck at km 13 on Heinrich-Heine-Strasse at the BVG long-term construction site","thumbnailUrl":"/api/media/867949151/small?db=stock","credit":"IMAGO / PEMAX","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}